
Large CO₂ production line certification project
A multi-stage industrial certification project lasting about two years and covering a large list of equipment within a CO₂ production line.
A large equipment scope required coordinated conformity assessment, technical documentation and work across multiple certification tasks rather than a single standard document.
Certification coordination and preparation of the documentation required for the equipment included in the project.
