EAC / EAEU Market Access
EAC certification for export to the EAEU
EAC Declaration for Plastic Extrusion Lines
For Plastic Extrusion Lines, machine function, hazards, drive system, operating mode, guarding and whether it belongs to a specifically listed machinery type are central to classification. We cross-check the product description with the applicable EAEU technical regulations and TN VED 8477, using the customs code as supporting evidence rather than as the only legal basis.

Quick compliance overview
- Product category
- Plastics & Rubber Machinery
- HS / TN VED
- 8477
- Assessment status
- EAC declaration for the stated industrial machinery scope
What is usually required for this product?
Prepare the machine layout, model and configuration matrix, safety justification with risk assessment, operating and maintenance documents, control and safety-function description, identification label and applicable test evidence. Identify the complete line boundary and any independently supplied modules. Define the supplied line from feeding and extrusion to cooling, haul-off and cutting. Document linked safety controls and interfaces; conformity documents for individual modules do not by themselves demonstrate integrated-line safety.
Which conformity route applies?
The assessment identifies the machine type and hazards first, then checks the relevant list position, safety evidence and conformity route. For complete industrial polymer-processing machinery within the stated scope, the Annex 3 declaration list of TR CU 010/2011 provides an EAC Declaration of Conformity route. Identify the actual machine function and supply configuration before choosing a serial-production or batch scheme.
Applicable technical regulations
This page concerns industrial production machinery. Household appliances, portable powered tools and technically different products need separate classification. Check additional electrical-safety, EMC, pressure, gas or explosion-protection regulations where the design and intended use bring them into scope.
Verified conformity information
Decision No. 36 of 13 March 2026 mainly took effect on 1 September 2026; its replacement of Annex 3 takes effect on 1 April 2028. Use the presently applicable product list and check country-specific implementation and existing-document transition provisions for the project.
Cost and timeframe
Final cost and duration depend on the applicable regulation, conformity scheme, testing scope, technical documentation, sample requirements and project configuration.
- •Machine type and hazard profile
- •Number of models and configurations
- •Safety-function and testing scope
- •Quality of risk assessment and technical documentation
Documents usually requested
For an initial assessment, manufacturers should normally be ready to provide:
- Machine layout and principal drawings
- Safety/risk assessment
- Operating manual and maintenance instructions
- Drive, control and safety-system description
- Product datasheet and complete model list
- Manufacturer and production-site details
- Proposed HS / TN VED classification (8477)
EACSERT project support
More than a document-issuance service
We can manage the certification cycle from preparation for testing through final issuance, including development or adaptation of most of the technical documentation required for conformity assessment.
Typical EAC conformity assessment process
The assessment identifies the machine type and hazards first, then checks the relevant list position, safety evidence and conformity route.
- 01
Identify the product and intended use
- 02
Check HS / TN VED and applicable EAEU regulations
- 03
Determine the required conformity route
- 04
Prepare technical and commercial documentation
- 05
Arrange samples, testing or production assessment where required
- 06
Issue/register the conformity document and confirm EAC marking
HS / TN VED code pages
Frequently asked questions
Why does the exact machine function matter?
Similar HS headings can contain machinery with different legal routes; function and listed product description must match.
Is a risk assessment normally important?
Yes. For machinery it is a core document for identifying hazards and demonstrating how safety measures are implemented.
Which EAC regulation applies to Plastic Extrusion Lines?
For complete industrial polymer-processing machinery within the stated scope, the Annex 3 declaration list of TR CU 010/2011 provides an EAC Declaration of Conformity route. Identify the actual machine function and supply configuration before choosing a serial-production or batch scheme.
Does the HS / TN VED code alone determine the route?
No. Customs classification is an important input, but the technical product description and the wording of the regulatory lists must be checked together.
Related products
Need an exact route for this product?
Send the product description, datasheet/manual and proposed HS / TN VED code. We will review the likely EAEU requirements and identify what is still needed for an exact quotation.
Get a free assessmentImportant: HS / TN VED codes and product names alone do not always determine the legal conformity route. Exact classification must consider product characteristics, intended use and current regulatory lists.