Your Partner for Certification in Russia, EAEU and International Markets
◎ EN | 中文✉ info@eacsert.com
EACSERTCertification & Compliance

EAC / EAEU Market Access

EAC certification for export to the EAEU

EAEU Compliance for Desilters

Use the actual model specifications and supply scope. Classification inputs: mud composition, separation or mixing duty, moving assemblies and skid interfaces. The procedure depends on the product function, materials, operating parameters, destination and regulatory exclusions. Check the current list and transition rules before choosing a scheme.

Desilters
✓Free initial assessment
✓English / 中文 support
✓Product-specific certification route

Desilters: Technical scope and market access

Parameters needed for classification

mud composition, separation or mixing duty, moving assemblies and skid interfaces.

Applicable procedure

Complete oilfield, geological-drilling, chemical-process and pumping machinery has relevant declaration entries in TR CU 010/2011 Annex 3. Identify the actual supplied machine and list position. Assess pressure-retaining parts under TR CU 032/2013 and equipment intended for explosive atmospheres under TR CU 012/2011 where applicable; the machine declaration does not replace those separate obligations.

Documents and supply scope

Prepare the model list, intended-use statement, technical specifications, materials or formulation, design documents, labels and instructions. Select test reports, safety justification or sanitary evidence for the actual product. Distinguish independently supplied components from the complete product and identify the destination country and supply arrangement.

Decision No. 36 of 13 March 2026 mainly took effect on 1 September 2026; the replacement of Annex 3 takes effect on 1 April 2028. Check the presently applicable list and destination-country transition provisions.

Check the regulatory scope, exclusions, product lists and commencement and transition provisions before selecting the conformity form and scheme. HS / TN VED is a classification aid; it does not by itself determine certification, declaration, state registration or a national procedure.

Official sources

Check the current regulatory lists and applicable conditions for the project.

Quick compliance overview

Product category
Oil, Gas & Petrochemical Equipment
HS / TN VED
8421
Assessment status
Check product scope and procedure

What is usually required for this product?

Use the actual model specifications and supply scope. Classification inputs: mud composition, separation or mixing duty, moving assemblies and skid interfaces.

Which conformity procedure applies?

Complete oilfield, geological-drilling, chemical-process and pumping machinery has relevant declaration entries in TR CU 010/2011 Annex 3. Identify the actual supplied machine and list position. Assess pressure-retaining parts under TR CU 032/2013 and equipment intended for explosive atmospheres under TR CU 012/2011 where applicable; the machine declaration does not replace those separate obligations.

Regulatory scopes to check

The procedure depends on the product function, materials, operating parameters, destination and regulatory exclusions. Check the current list and transition rules before choosing a scheme.

Conformity requirements

Complete oilfield, geological-drilling, chemical-process and pumping machinery has relevant declaration entries in TR CU 010/2011 Annex 3. Identify the actual supplied machine and list position. Assess pressure-retaining parts under TR CU 032/2013 and equipment intended for explosive atmospheres under TR CU 012/2011 where applicable; the machine declaration does not replace those separate obligations.

Cost and timeframe

Final cost and duration depend on the applicable regulation, conformity scheme, testing scope, technical documentation, sample requirements and project configuration.

  • •Pressure-equipment category
  • •Design pressure, volume or nominal diameter
  • •Working medium and fluid group
  • •Strength calculations, tests and technical dossier completeness

Documents usually requested

For an initial assessment, manufacturers should normally be ready to provide:

  • General arrangement and pressure-boundary drawings
  • Design pressure/temperature and medium data
  • Strength calculations and material specifications
  • Safety devices and test documentation
  • Product datasheet and complete model list
  • Manufacturer and production-site details
  • Proposed HS / TN VED classification (8421)

EACSERT project support

More than a document-issuance service

We can manage the certification cycle from preparation for testing through final issuance, including development or adaptation of most of the technical documentation required for conformity assessment.

10,000+
certification projects delivered across the team's experience
200+
specialists in the wider expert network
Technical documentation
We can develop or adapt most documents needed for the conformity project.
Certification of drilling equipment manufactured in China

Related EACSERT experience

Certification of drilling equipment manufactured in China

Complex conformity work for drilling rigs and related equipment supplied from China for use in demanding industrial environments.

What the project required

The project combined machinery conformity requirements, explosion-protection certification and additional industrial-safety tasks for individual equipment.

See case studies →

Typical EAC conformity assessment process

The assessment first determines whether the product falls within pressure-equipment scope and which category applies; only then is the conformity procedure fixed.

  1. 01

    Identify the product and intended use

  2. 02

    Check HS / TN VED and applicable EAEU regulations

  3. 03

    Determine the required conformity route

  4. 04

    Prepare technical and commercial documentation

  5. 05

    Arrange samples, testing or production assessment where required

  6. 06

    Issue or register the applicable document and confirm the required marking

HS / TN VED code pages

Frequently asked questions

Which parameters decide the pressure-equipment category?

The decisive inputs include pressure, volume or nominal diameter, medium and fluid group, together with the regulation's scope rules.

Can the HS code determine the pressure category?

No. The code helps identify the product, but the legal category is parameter-based.

Which regulatory procedure applies to Desilters?

Complete oilfield, geological-drilling, chemical-process and pumping machinery has relevant declaration entries in TR CU 010/2011 Annex 3. Identify the actual supplied machine and list position. Assess pressure-retaining parts under TR CU 032/2013 and equipment intended for explosive atmospheres under TR CU 012/2011 where applicable; the machine declaration does not replace those separate obligations.

Does the HS / TN VED code alone determine the route?

No. Customs classification is an important input, but the technical product description and the wording of the regulatory lists must be checked together.

Related products

Need an exact route for this product?

Send the product description, datasheet/manual and proposed HS / TN VED code. We will review the likely EAEU requirements and identify what is still needed for an exact quotation.

Get a free assessment

Important: HS / TN VED codes and product names alone do not always determine the legal conformity route. Exact classification must consider product characteristics, intended use and current regulatory lists.